Offer letter format or Sample
Ref: FC/Offer/ft-2/19, 2017 Date: February 19, 2017
To,
Fmilytex
(BD) Ltd.
Plot no-47, 48, Road -05,
Sector
– 04, CEPZ,
Chittagong,
Bangladesh.
For
Attn.
Engineering
Department
Dear
Sir,
With reference to our discussion
regarding the retrofitting work, at
factory building of Your Factory Premises at NLZ
(BD) Ltd. We are Pleased to
Submit our
Technical & financial offer.
We
hope that our proposal will be in line with your requirements and please do not
hesitate to
Contact us if you require any clarification.
Thanks for your co-operation.
With Best Regard's
Md. Mahmudul Hasan Bhuiyan (Rana)
Managing Director
Focus Engineering & Construction
Cell: +8801818980727
Email: rana.bspi@yahoo.com
To,
Fmilytex
(BD) Ltd.
Plot no-47, 48, Road -05,
Sector
– 04, CEPZ,
Chittagong,
Bangladesh.
Sub- Offer
for Retrofitting
works at NLZ (BD) Ltd.
Sl no
|
Description
|
unit
|
Quantity
|
Rate
|
Taka
|
1
|
Dismantling
of RCC /CC in Floor
|
sft
|
1572.77
|
100.00
|
157,277.12
|
2
|
Dismantling
of 5" Brick wall for Column Retrofitting
|
sft
|
798.00
|
15.00
|
11,970.00
|
Dismantling
of 10" brick wall
|
sft
|
1.00
|
25.00
|
25.00
|
|
3
|
Rubbish
carry from floor to safe place inside factory Boundary
|
cft
|
995.72
|
7.00
|
6,970.07
|
4
|
Earth
Excavation up to 7'0''
|
cft
|
9436.63
|
15.00
|
141,549.41
|
5
|
Back
Filing
|
cft
|
8155.47
|
7.00
|
57,088.26
|
6
|
Brick
Flat Soling
|
sft
|
1572.77
|
4.00
|
6,291.08
|
7
|
10"
Brick wall for Column Retrofitting
|
cft
|
1.00
|
30.00
|
30.00
|
5"
brick wall
|
sft
|
1.00
|
15.00
|
15.00
|
|
8
|
5"
CC work in Floor with brick cheeps (1:3:6)
|
sft
|
1572.77
|
55.00
|
86,502.42
|
9
|
1.5"
peton stone Flooring with NCF(1:1.5:3)
|
sft
|
1572.77
|
15.00
|
23,591.57
|
10
|
New
plaster in wall & celling
|
sft
|
1.00
|
15.00
|
15.00
|
11
|
RCC/
Plaster chipping in Column
|
sft
|
1949.13
|
8.00
|
15,593.05
|
12
|
Chemical
apply in column new & old concrete bonding agent "BASF
Masterbrace_1414"
|
sft
|
172.64
|
5.00
|
863.20
|
13
|
10mm
@ Shear connector 4" c/c, BASF
|
nos
|
2100.85
|
10.00
|
21,008.48
|
14
|
16,
20mm dia main bar in column
|
nos
|
672.00
|
15.00
|
10,080.00
|
15
|
New
RCC 3/4" stone cheeps (1:1.5:3)
Works in Base/ Footing
|
cft
|
1281.16
|
120.00
|
153,739.37
|
16
|
New
RCC 3/4" stone cheeps (1:1.5:3)
Works in Column
|
sft
|
1564.08
|
80.00
|
125,126.40
|
17
|
Shattering
works
|
sft
|
948.55
|
35.00
|
33,199.35
|
18
|
MS
bar
|
kg
|
7701.18
|
5.00
|
38,505.90
|
Total
|
889,440.68
|
Eight Lac Eighty Nine Thousand Four
Hundred Forty and Sixty Eight Pasha Only
Important Note:
1. Work
facilities ensure by factory authority.
2. Offer
rate consider only service cost (without materials)
3. Above
rate 10% each above floor.
Terms and Conditions:
1. Scope
of Work:
a. Contractor Responsibility:
i.
Contractor will maintain the quality and safety
of the Works.
ii.
Our scope of work is limited to complete the
works as per list provided with this offer
iii.
Any additional item rate will be considerate as
market price.
b. Client’s Responsibility:
i.
Providing the concerned departmental personnel
to ease the works.
ii.
All shattering materials likes, wood, bamboo,
nail, steel prof, I-joist, weir, rough provide by authority.
iii.
All construction materials should be in site in
due time.
iv.
Work place should be vacant 12 hour earlier.
v.
Work plan provide by authority as their
requirement.
vi.
Procuring all sorts of permission and
formalities from the authorities/bodies.
vii.
Ensuring the work environment to continue the
works.
viii.
All excess rubbish, clay, and soil will be
carried out from factory premises by Authority.
c. Time Line: As per our assumption the
work will need 6 month maximum to complete. Contingency:
Deliverable may delayed due to
following issues
·
Natural disasters
·
Road Blockage
·
Instability at factory level due to workers
vexation
·
Any unwanted situation beyond control
2. Payment
terms:
i.
50%
advance in favor of Focus Engineering &Construction with the confirmed PO/work
order
ii.
1st
Running bill will be submit 20% based on work order value after completion of
50% works.
iii.
2nd
Running bill will be submit 20% based on work order value after completion of
40% works
iv.
3rd
running bill/Final bill will be submit 10% or above/lass as actual site
measurement after completion of 100% work.
3. Offer
Submitted Excluding TAX & VAT
.
With Best Regard's
Md. Mahmudul Hasan Bhuiyan (Rana)
Managing Director
Focus Engineering & Construction
Cell: +8801818980727
Email: rana.bspi@yahoo.com